Critical path
noun
the necessary path or sequence from start to finish, determining the time needed for completion; the longest most time-consuming path in a network
Read Also:
- Critical period
noun 1. (psychol) a period in a lifetime during which a specific stage of development usually occurs. If it fails to do so, it cannot readily occur afterwards noun a time in a person’s development in which a certain skill or characterized would be most readily acquired Usage Note psychology
- Critical path analysis
noun 1. a technique for planning complex projects by analysing alternative systems with reference to the critical path, which is the sequence of stages requiring the longest time Compare programme evaluation and review technique
- Critical-point
noun 1. Physics. the point at which a substance in one phase, as the liquid, has the same density, pressure, and temperature as in another phase, as the gaseous. 2. Mathematics. noun 1. (physics) 2. (maths) the US name for stationary point critical point
- Critical-pressure
noun, Physics. 1. the pressure of a pure element or compound at a critical point. noun 1. the pressure of a gas or the saturated vapour pressure of a substance in its critical state critical pressure The pressure of a substance at its critical point.
- Critical-ratio
noun, Statistics. 1. a ratio associated with the probability of a sample, usually the ratio of the deviation from the mean to the standard deviation.