Critical path



noun

the necessary path or sequence from start to finish, determining the time needed for completion; the longest most time-consuming path in a network

Tagged:

Read Also:

  • Critical period

    noun 1. (psychol) a period in a lifetime during which a specific stage of development usually occurs. If it fails to do so, it cannot readily occur afterwards noun a time in a person’s development in which a certain skill or characterized would be most readily acquired Usage Note psychology

  • Critical path analysis

    noun 1. a technique for planning complex projects by analysing alternative systems with reference to the critical path, which is the sequence of stages requiring the longest time Compare programme evaluation and review technique



  • Critical-point

    noun 1. Physics. the point at which a substance in one phase, as the liquid, has the same density, pressure, and temperature as in another phase, as the gaseous. 2. Mathematics. noun 1. (physics) 2. (maths) the US name for stationary point critical point

  • Critical-pressure

    noun, Physics. 1. the pressure of a pure element or compound at a critical point. noun 1. the pressure of a gas or the saturated vapour pressure of a substance in its critical state critical pressure The pressure of a substance at its critical point.



Disclaimer: Critical path definition / meaning should not be considered complete, up to date, and is not intended to be used in place of a visit, consultation, or advice of a legal, medical, or any other professional. All content on this website is for informational purposes only.